KAHRAMAA GTC/29/2003 - Call-Off Contract for Construction & Dismantling of Distribution O/H Line
Call-Off contract to construct and commission 100 km of new 11 kV over head lines in different parts of Qatar.
 
KAHRAMAA GTC/37/2004 - Call-off Contract for Extension of LV U/G Network and Service Connections.
Call-off contract for excavation, laying of cables and jointing, install MCCBs, Energy Meters, terminate service cable at the MCCB, make all interconnections of MCCB, energy meter and consumer mains and make it ready for successful energizing.
 
KAHRAMAA

GTC 37/2001 - Ras Laffan Water Pipelines - Electrical & Mechanical Works of the Booster Pumping Station
Main Contractor : M/s. Mabani Qatar

  • Indoor 11 kV Switchgear (8 Panels)
  • 11 kV MCC Panel (18 Panels)
  • Capacitor Bank
  • 20 km of 11 kV 3C x 240 mm2 cable laying including joints & termination
  • small power of the building
  • HVAC
KAHRAMAA 132 kV and 66 kV Overhead grid for Qatar
KAHRAMAA All 11 kV distribution and jointing works at Ras Abu Fontas Power station
 

TOP

Qatar Petroleum
(MIC)

GTC 179/ED/01 - EPIC of Crushed Stone Import Facilities at Mesaieed
Main Contractor : M/s. Grandi Lavori Fincosit ME

  • Supply, installation, testing & commissioning of 6 Nos. 11 kV Indoor substation including indoor switchgear 24 panels, 6 Nos. 11kV/.415 kV transformers, 6 Nos. 415V Main Switch Board.
  • 12 km of 11 kV cable 3C x 240 mm2
  • Provide 11 kV power supply to 2 Nos. Kangaroo cranes including the special joint with the crane cable.
  • Complete street lighting system and power distribution for several facilities.
  • Fender Lights
  • Highmast

Qatar Petroleum
(MIC)

GTC 196/ED/01 - EPIC of Roads & Bridges for Crushed Stone Import Facilities at Mesaieed
Main Contractor : M/s. As-ka / Ascon / Mabani

  • Supply, installation, testing & commissioning of 2 Nos. 11 kV Indoor substation switchgear (9 panels), 2 Nos. 11kV/.415 kV transformers, 2 Nos. 415V Main Switch Board.
  • Supply, Installation, Testing & Commissioning of 3 Nos. Package substation
  • 6 km of 11 kV cable 3C x 240 mm2
  • Street Lighting system
Qatar Petroleum
(Dukhan)

GTC 174/ED/03 - EPIC of Replacement of Turbine MCC's at FSP
Main Contractor : M/s. Iscosa

Complete installation works which include:

  • Termination of power cables for 5 Nos. MCC Panels serving 5 Nos. of gas turbine.
  • Termination of power & control cables for motors, pumps and air cooler fans for the 5 Nos. turbines.
  • Termination of control & instrument cables for DCS & telemetry systems serving the 5 Nos. turbines.
Qatar Petroleum
(Ras Laffan)

GTC 200/ED/01 - New Lee Breakwater Piperack at Ras Laffan
Main Contractor : M/s. GLF

Supply, installation, testing for complete earthing system

Qatar Petroleum
(MIC)

GTC 103/ED/01 - Multi Products Berth and Small Craft Berth at Mesiaeed - Electrical and Potable Water System
Main Contractor : M/s. GLF

Supply, installation, testing & commissioning of

  • 6.6 kV/0.415 package substation
  • Distribution Boards
  • Power supply to quick release hooks
  • Street lighting & Port Lighting
  • Power sockets

TOP

Qatar Petroleum
(Ras Laffan)

GTC 101/DE/01

Electrical installation testing and commissioning of 9 nos package substations and 2 nos 11kv switching substation 24 panels includes all the 11kv termination, jointing, all the related tests includes but not limited to HIGH POT, MEGGER, PRIMARY INJECTION TEST, SECONDARY INJECTION TEST, DUCTER TEST etc.
 

Qatar Petroleum GTC 118/96, 11 kV Distribution System at Ras Laffan Industrial City (Subcontract work for installation of 20 km 11 kV cable and 9 package substations and 300 nos 12 m street lighting poles)
 
Qatar Petroleum GTC-114/97, 11 kV Distribution system at Ras Laffan Ind. City (Subcontract of electrical installation including 1200 m 3C300 cable for street lighting power supply. 4 package substations 11/0.433 kV -1250 KVA installation testing and commissioning 150 nos 12 m street lighting poles and four feeder pillar)
 
Qatar Petroleum Chiyoda Access Road - associated street lighting works including power supply testing and commissioning.
 
Qatar Petroleum 33 kV Overhead distribution lines in Dukhan Area
 
Qatar Petroleum Construction of Second 33 kV Overhead line from FSP TO JDS and PWI Cluster 2
 
Qatar Petroleum Upgrading of 33 and 11kV distribution system at NODCO Refinery
 
Qatar Petroleum

RAS LAFFAN WORKSHOP - GTC 156/98
Main Contractor : Al Muftah

Complete supply & installation of 11 kV package sub substation with all the related modifications on the 11kV network required including supply & installation of 11 kV cables and joints, high pressure tests.
 

Qatar Petroleum

RAS LAFFAN GTC 147
Main Contractor : KABAS

Complete design and installation works for Northern and southern works in RAS LAFFAN including all the design works for electrical roads and installation testing and commissioning for the complete job.
 

CED

SMISMA ROUTE 12
Main Contractor : QBC

Complete electrical and street lighting works includes 11kv network modifications, on over head line, complete supply of materials installation testing and commissioning , install 4 Nos. of pole mounted transformers to provide supply for the street lighting network, 1kV network modification, street lighting network works.
 

CED

ROUTE 55
Main Contractor : Teyseer Cont.

Complete electrical and steel lighting works includes 11kV network modifications, Over head line modification jobs, install 3 new pole mounted transformers to provide supply for street lighting network, 1kV network modification , street lighting network.
 

CED

AL RAWABI SIGNAL
Main Contractor : QBC

Complete electrical and steel lighting works includes 11kV network modifications, 1kV network modification, street lighting network including 4 high masts and signal traffic power supply works.
 

CED

MUAITHER MAIN ROAD
Main Contractor : Shannon Trad. & Cont.

Complete electrical and street lighting works includes 11kV network modifications, over head line, complete supply of materials, installation testing and commissioning, install 2 Nos. of pole mounted transformers to provide supply for the street lighting network, 1kV network modification , street lighting network.
 

CED

WEST BAY LAGOON

Power supply to the bridges barriers at West Bay Lagoon.
 

CED

ERC 0620/C1 RIW Rayyan Sports Club Roads
Main Contractor M/s. Cleopatra Trading

  • Installation, testing & commissioning of street lighting system
  • Modification of 11 kV system which includes dismantle of OHL and lay 11 kV cables.
  • Modification on existing Overhead line.
     

TOP

BED

Infrastructure works for New Container Terminal at Doha Port
Main Contractor : M/s. Arcon

Supply, Installation, Testing & Commissioning of

  • Indoor 11 kV Switchgear
  • Indoor 3.3 kV switchgear
  • 2 Nos. 3.3 kV transformers
  • 4 Nos. 11 kV/0.415 kV Transformers
  • 6 km of 11 kV cable 3C x 240 mm2
  • Connection to 3.3 kV cranes
  • 4 Nos. 415 Main Distribution Board
  • 4 Nos. Stand By Generators
  • 360 Nos. Power sockets for refrigerant point
BED

Secondary School for Boys at Meizer
Main Contractor : M/s. Lotus Trading & Contracting

  • Installation of electrical accessories, lighting and small power
  • Installation of services : Fire Alarm System, Telephone & computer
  • Installation of Lightning protection system
  • External lighting
  • Testing & Commissioning
     
BED

Secondary School for Boys at Meizer
Main Contractor : M/s. Lotus Trading & Contracting

  • Installation of electrical accessories, lighting and small power
  • Installation of services : Fire Alarm System, Telephone & computer
  • Installation of Lightning protection system
  • External lighting
  • Testing & Commissioning
     
BED

Preparatory School for Boys at Meizer
Main Contractor : M/s. Lotus Trading & Contracting

  • Installation of electrical accessories, lighting and small power
  • Installation of services : Fire Alarm System, Telephone & computer
  • Installation of Lightning protection system
  • External lighting
  • Testing & Commissioning
     
Q-Tel GEN/871/56-2003 - Electrical works for Providing Power Supply to GSM site at Mukainis
 
Q-Tel GEN/890/19-2004 - Supply to Q.Tel GSM Tower at Al Ghariya
 

TOP

Q-Tel GEN/890/19-2004 - Supply to Q.Tel GSM Tower at Umm Al-Ghab
 
Ministry of Energry & Industry Small & Medium Scale Industrial Area in Doha City - Construction of Gas Distribution Network Phase I of Stage I
 
Khalifa Sports City Development Committee

Tender No. KSCDC/225/04
Khalifa Sports City - Supply & Installation of 11 kV Switchgear

  • Installation, testing and commissioning of Indoor 11 kV Switchgear (11 panels)
  • 11 kV 3C x 120 mm2 cable supply, lay & termination
Qatar Petrochemical Company 33 kV and 11 kV distribution system at Umm Said
Qatar Fertilizer Company 33 kV and 11 kV distribution system at Umm Said
 
Qatar Armed Forces
(BABNi) Al Udaid
Package III
11 kV Distribution System, 20 km of HV cable and 3 outdoor substations
 
QREI CO. - RAS GAS PROJECTS Ras Gas housing projects where complete electrical installation related to infrastructure packages are executed by Qatar Power Construction. Through two subcontracts with Darwish Engineering and Teyseer Cont. Co QPC has installed 9 km of 11 kV network and 17 secondary substation. Complete 1 kV network including 17 Nos. MDB 2500A and associated SDB (total 82 Nos) and 540 street lighting poles and 14 feeder pillars. Contracts are included procurement of all items related to 1 kV and street lighting system.
 
US ARMY Electrical works includes 11kv cable laying, termination, jointing, testing and commissioning.
 

TOP

Cable De Lyon Subcontract for 66 kV cable installation and assistance with jointing
 
Infrastructure facilities at Education City Remove existing 11kv network including OHL , cables, switchgears, RMUs and transformer for 3 Nos substations and made all the related modifications.
 
Infrastructure Works
at West Bay

West Bay Lagoon Package B - subcontract for electrical installation comprising 14 secondary substations and 11 kV and 1 kV network. Main contractor Darwish Engineering.

West Bay Lagoon Package C - subcontract for electrical work and street lighting. Contract include underbridge flood light installation for 5 bridges. Main Contractor HBK CONT.

West Bay Lagoon Package J - subcontract for electrical work comprising 11 kV network.
 

Infrastructure works
at West Bay

Each of the below given project include 12 to 15 secondary substations and related 11 kV network as well as 1 kV network design to serve app. 250 housing plots.

NDOD 1200 Block 1 & 2 as Subcontractor to Darwish Engineering
NDOD Block 3 & 8 as subcontractor to NICC
NDOD Block 5 & 6 as subcontractor to KBAS
NDOD Block 4 & 5 as subcontractor to HBK
 

SUPPLY TO 160 VILLA COMPLEX AT GHARAFA - Marbia Cont. Provide supply to 160 villa complex including installation of 3 nos outdoor substations and install HV and MV cabling , services joints up to service cutout.
 
Al Jabor Real Estate

30 Villas at Ras Abu Aboud
Main Contractor : M/s. Al Emara Al-Islamiya

  • Installation of electrical accessories, lighting and small power
  • Installation of services : Fire Alarm System, Telephone
  • Installation of Lightning protection system
  • External lighting
  • Testing & Commissioning
     