PROJECT 1
GTC/666/2014 - Call-Off Contract Electricity Distribution Network Works

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

GTC/666/2014 – Call-Off Contract Electricity Distribution Network Works . Call-Off contract for Civil construction of 400 numbers of Indoor & 125 nos of Outdoor type of Distributing substation, Excavation and laying of 11 kV/Pilot/LV main/Service cable, excavating & providing road crossing duct, Fixing Service cutout (MCCBs),Delivery and fitting of substation plant in distribution substation.

PROJECT 2
GTC/448/2011 - Call-Off Contract Electricity Distribution Network Works.

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

GTC/448/2011 – Call-Off Contract Electricity Distribution Network Works. Call-Off contract for Civil construction of 60 number indoor & 120 number Outdoor type of Distributing substation, Excavation and laying of 11 kV/Pilot/LV main/Service cable, excavating & providing road crossing duct, Fixing Service cutout (MCCBs),Delivery and fitting of substation plant in distribution substation

PROJECT 3
The Pearl Qatar; CP/3-10 - 11 kV Switchgear & Transformers at 41 Tower and Twinhouse at Porto Arabia

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : UNITED DEVELOPMENT CO.

Supply of 11 KV works AT PORTO ARABIA Towers and Twin Homes- Pearl Qatar
1.Supply , installation testing and Commisioning of 11 KV SWGs.
2.Supply , installation testing and Commisioning of Transformers.
3.Supply , installation testing and Commisioning of All releated MV Cables.

PROJECT 4
GTC/196- Call-Off Contract for Electrical Distribution Networks

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

Call-Off contract for Civil construction of Indoor & Outdoor type of Distributing substation, Excavation and laying of 11 kV/Pilot/LV main/Service cable, excavating & providing road crossing duct, Fixing Service cutout (MCCBs), Delivery and fitting of substation plant in distribution substation.

PROJECT 5
GTC/744/2015 - Call-Off Contract for Replacement of Old distribution Equipment

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

Replacemnet of 11 KV Distribution Substation Equipment which includes :-
1.Installation , Testing and Commisioning of 900 nos of 11KV Panel.
2.Installation , Testing and Commisioning of 810 nos of Rmu.
3.Installation , Testing and Commisioning of 810 nos of Transformers and Feeder Pillars.
4.Installation , Testing and Commisioning of 50 nos Package Substations.
5.installation of 11KV and LV cables including Termination works inside Substations and Jointing works outside substation in additional to full Earthing System.
6.Dimantling and Delivery of old Distribution substation to designated KAHRAMAA Store.

PROJECT 6
GTC/848/2016 Service Agreement for Outsourcing of Technical Manpower for Electricity Distribution Maintenance Works

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

1.Provide (8nos) Electrical Engineer for Operation, Switching and Maintenance (Cable, Substation & OHL )
2. Provide (10nos) Inspectors for Patrolling & Inspection (Substation Maintenance, OHL Maintenance and Cable maintenance).
3.Provide (3 Nos) Assistant Maintenance Planner.
4.Provide (3Nos) Condition Monitoring Technician

PROJECT 7
Total Renovation, Construction, Completion and Maintenance of Khalifa Stadium and Museum at Aspire Zone - 11kV/LV Cable Laying and Substation Works (Order No.546-QS2-MSJV-WO-025 dated 29/06/2015)

Main Contractor : MIDMAC – SIX CONSTRUCT

Owner : ASPIRE ZONE FOUNDATION

1. installation testing and Commisioning of 11 substations inclding installation 11KV Substations including 11KVS SWG , Transformers Marshalling Boxes , Tripping unit and Cabling works.
2. installation testing and Commisioning of All releated MV Cables (17 Kilometer).
3.Installation of Fiber Optic works, inluding cable blowing , Termination and Jointing works.

PROJECT 8
Al Wakrah 2022 Stadium Infrastructure Design - LV Cable Routing of Infra & Potable Water Pumping Station SS 1/2 (28151) FSFP - 11KV Works (W.O Ref.549MPSJV-WO-MEP-00222Rev.0 dated 15/08/2017

Main Contractor : MIDMAC – PORR-SIX CONSTRUCT (JV)

Owner : SUPREME COMMITTEE FOR DELIVERY & LEGACY

1. installation testing and Commisioning of 18 11KV Substations including 11KVS SWG and Transformers.
2. installation testing and Commisioning of All releated MV Cables (7 Kilometer).
3.Shut Down & Dismantling the old substation and hand it over to KAHRAMAA

PROJECT 9
New Orbital Highway & Truck Route (NOH2)

Main Contractor : QDVC – BIN OMRAN JV

Owner : ASHGHAL

1.Diversion works for Overhead lines 11KV
Including , removal of overhead poles , cables , Supply new Terminal Poles and converting itermidate poles to terminal poles.
2.Supply , installation ,Testing and Commisioning including all Civil works for 3Cx240 + Pilot cables (8

PROJECT 10
Electrical Installation for Doha West Sewage Treatment Works Extension 5 (WO.TAA.076.2016 dated 11/04/2016

Main Contractor : SUEZ (VELORIA) 

Owner : ASHGHAL

MV Package comprises the following
– MV switchgear + Tripping Unit
– Distribution Transformers.
– MV Cables.
LV Package comprises the following
– MLVSB : Medium/ Low voltage Switch Board.
– MCC : Motor Control Center.
– VFD Panels.
– Control Panels in Process Buildings.
– Ballast panels for UV modules.
– PLC/Scada control system.
– PLC Cabinets.
– LV and Control Cables.
– Fiber optic Cables.
including supply and installation of Cable Containment works

PROJECT 11
BYPASS from RAWDAT RASHED VILLAGE TO UMM GARN - PACKAGE 3 - Construction of Substation (PO # 72566 dated 13/11/2016) QS-016

Main Contractor : BOOM CONSTRUCTION CO.

Owner : ASHGHAL

1.Constuction of 2 indoor substations and 6 nos of Package Substations including supply of 11KV Switchgears , Package Substations , Transformers ,Feeder Pillars and all MV and LV cables.
2.Diversion works for Overhead lines 11KV /LV
Including , removal of overhead poles , cables , Supply new Terminal Poles and converting itermidate poles to terminal poles.
3.Supply , installation ,Testing and Commisioning including all Civil works for 3Cx240 + Pilot cables (23 Kilo Meter) .
4.Supply , installation ,Testing and Commisioning including all Civil works for LV Cables (6 Kilo Meter)

PROJECT 12
Design & Construct New Orbital Highway & Truck Route (P023) Contract 3: Orbital Highway: Mesaieed to Salwa Road (Contract No: C2013/118) - (SUBCONTRACT AGREEMENT NO. NOH3/SCA/045 dated 27/10/2016)

Main Contractor : LEIGHTON CONTRACTING QATAR WLL – ALJABER ENGINEERING LLC (JV) 

Owner : ASHGHAL

Design and Construction of 10 nos of Indoor Substations including the following:-
1.Construction of Substations.
2.Supply , installation testing and Commisioning of 11 KV SWGs.
3.Supply , installation testing and Commisioning of 500KVA Transformers.
4.Supply , installation testing and Commisioning of Free Stand Feeder Pillars.
5.Supply , installation testing and Commisioning of All releated 11KV and LV Cables.

PROJECT 13
Western Taxiway and Stand Development Works at Hamad International Airport

Main Contractor : UCC-BAHADIR-TEDESCHIA (JV)

Owner : QATAR COMPANY FOR AIRPORT OPERATIONS AND MANAGEMENT (MATAR)

1. Laying of 6700 Meters of 72kV EHV and 66kV HV Cicuit cables including supply and installation of FTB , CBS and Concrete Cable Tiles including of Fiber optic and Earthing Cables.
2.Installation , Testing and commisioning of 130k meters of 11KV 3C 300 Mv Cable+Pilot including Cable Termination and Jointing works.

PROJECT 14
Al Shahaniyah Camel Race Project – HV Work

Main Contractor : M/s. AL BAIDA TECHNICAL SERVICES W.L.L 

Owner : CAMEL RACE

Supply, Install, Testing and Maintenance of
•14 m high lighting poles complete with 4 nos metal halide lighting fixture, 400 watts each – 1350 Nos.
•HV network consists of 7 Nos. outdoor & 1 No. Indoor Substation.
•Distribution of feeder pillars, MV cable, Street Lighting Cable, Control Panels and Earthing.

To Know more......