Ongoing projects

Our Major Projects

PROJECT 1
GTC/1140/2023 - Call-Off Contract for Replacement of Distribution Substation Equipment

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

Replacement of 11 KV Distribution Substation Equipment which includes :-
1.Installation , Testing and Commissioning of 400 nos of 11KV Panel.
2.Installation , Testing and Commisioning of 200 nos of Rmu.
3.Installation , Testing and Commisioning of 600 nos of Transformers and Feeder Pillars.
4.Installation , Testing and Commisioning of 60 nos Package Substations.
5.installation of 11KV and LV cables including Termination works inside Substations and Jointing works outside substation in additional to full Earthing System.
6.Dimantling and Delivery of old Distribution substation to designated KAHRAMAA Store.

PROJECT 2
GTC/1209/2024 - Disconnection and Maintenance of Distribution Services and Fault Repairs

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

1. Disconnections and Maintenance of Existing services including from
substation plants (switchgear/transformer/ Feeder Pillar).
2. Excavate to make trial trench to locate MV/LV cables OR for Disconnection
of Cables MV/ MV + Pilot/ Pilot cables/LV.( Without laying cables).
3. Replacement of defective MCCBs at the consumer premises.
4. MV/LV Cable faults Repair works on KM Network.

PROJECT 3
QAF (STAC/CW/49/2023 (Z-311-01) Works and Extension for 11KV Network)

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : QATAR ARMED FORCES

1.Construction of 4 generators Rooms
2.Supply, installation , Testing and Commissioning of 11 Nos of Generator including Fuel System.
3.Supply, installation , Testing and Commissioning of 11 Nos of 1600KVA Transformers.
4.Supply, installation , Testing and Commissioning of 11 Nos of 11KV SWG.
5.Supply and installation of 40 Kilo Meter of 11KV MV Cables including all releated Civil Works.

PROJECT 4
Complete Civil Works and Cable Laying Works - Kahramaa Power Transmission System Expansion - GTC/1068B/2022-C3 Package

Main Contractor : ELSEWEDY CABLES

Owner : KAHRAMAA

1. Laying of 45 Kilo Meters of 132kV EHV and 66kV HV Cicuit cables including supply and installation of FTB , CBS and Concrete Cable Tiles.
2.Civil works for trench preparation, including the installation of joint bays and link boxes for 132kV EHV and 66kV HV cables.
3.Road Crossing Open Cut Method and Horizontal Drilling works.
4.Ashphalte , Interlock and Grass Reinstatment work as per Kahramaa and Ashghal Standards.

PROJECT 5
TSE Seasonal Storage Lagoon Project Phase 1 - Civil & MEP Works

Main Contractor : HYUNDAI ENGINEERING & CONSTRUCTION 

Owner : ASHGHAL

Civil Works:
•Construction of Substations, Buildings, Pumping Station & Potable Water Tank.
•Landscaping (Interlock & Kerb Stone) around buildings.
Electrical Works :
•Supply, Installation, T&C of Lighting & Small Power, Isolators, including necessary Conduits, trays, cabling, supports., connections, terminations and accessories.
•Supply, Installation, T&C of LV Switchgear Panels, ACB, ATS, PFC, APFC, SMDB, DB, UPS, Battery Rack, FP including necessary cabling, supports., connections, terminations and accessories.
•Cable Laying & Installation of Street Lighting Columns.
•Supply, Installation, T&C of fire alarm, FM200, FM200 Capsular system, Fire Extinguisher equipment and devices including wires, conduits, trays, connections, fixings, and complete all in accordance to QCDD & KM Spec.
Supply, Installation of Field Instrument devices (Analyzer, Level Transmitter & Switch, Pressure Indicating Guage) including wires, conduits, trays, connections, fixings, support all in accordance with specification
•Supply, Installation, T&C of Power, Control, Communication & FO cables.
ICT Works :
•Supply, Installation, T&C of PAS, ACS, CCTV, Voice and Data System, including necessary Conduits, trays, cabling, supports., connections, terminations and accessories.
SCADA Works :
•Supply, Installation, T&C of PLC/SCADA including necessary cabling, supports, connections, terminations and accessories.
Mechanical & Plumbing Works :
•Supply, Installation, T&C of Drainage system including necessary equipment, device, instrument, pipe, manhole, water outlet, support, fitting and accessories.
•Supply, Installation, T&C of HVAC system including necessary equipment, device, instrument, pipe, duct, sand trap louver, damper, thermostat, cabling, support, fitting and accessories.
•Supply, Installation, T&C of Pumping Station PKG including equipment, device, pipe, instrument, pump, wires, etc and the like; complete all in accordance with the drawings and specification

PROJECT 6
LTC/2053/2024 - Disconnection and Reconnection of Electrical Services from Cable

Main Contractor : QATAR POWER CONSTRUCTION W.L.L

Owner : KAHRAMAA

PROJECT 7
66KV Cable Line from Abu Hamour Supper S/S to Umm Al Seneem-2 S/S (Double Circuit) & 66KV/120MVA Cable Line Modification of Existing 66KV Line Al Gharrafa S/S - Khalifa Town South-1, LILO Into Khalifa Town North S/S

Main Contractor : LARSEN & TOURBO LIMITED

Owner : KAHRAMAA

1. Laying of 14 Kilo Meters of 66kV HV cables including supply and installation of FTB , CBS and Concrete Cable Tiles.
2.Civil works for trench preparation, including the installation of joint bays and link boxes for 132kV EHV and 66kV HV cables.
3.Road Crossing Open Cut Method and Horizontal Drilling works.
4.Ashphalte , Interlock and Grass Reinstatment work as per Kahramaa and Ashghal Standards.

PROJECT 8
Qatar Lusail Expressway (QLUS) Relocation of TLCPs

Main Contractor : HYUNDAI ENGINEERING & CONSTRUCTION 

Owner : ASHGHAL

• Installation of High Mast Poles
• Tunnel Lighting
• Supply and install necessary accessories materials (concrete tile, warning tape, special backfilling (FTB/CBS) & equipments for the execution of EHV cabling 132kV 1Cx2000sq.mm, 132kV 1Cx 800sq.mm, 66kV 1Cx500sq.mm, 66kV 1Cx1000sq.mm (except supply of EHV cables) in trenches, ducts, troughs, chambers, utility micro-tunnels, including connecting to existing feeders/cables or to electrical substations, testing and commissioning to QGEWC € Specifications, requirements and approval.
• Commissioning Test (LV & HVAC Test)
• Supply equipments and accessories for the execution of HV/MV/LV cabling only (except supply of HV/MV/LV cables) and install HV/LV feeders/cables in trenches, ducts, troughs, chambers, utility micro-tunnels, including jointing and connecting to existing feeders/cables or to electrical substations, testing and commissioning to QGEWC€ Specifications, requirements and approval.
• Dismantle and Relocation of LCP Panel from Existing Electrical room to external GRP kiosks
• Supply & Installation of GRP Kiosk including Civil construction works

PROJECT 9
Arche Lightings (CI No.CI-SC-QPC.ELEC-010 dated 11/11/2017)

Main Contractor : HYUNDAI ENGINEERING & CONSTRUCTION 

Owner : ASHGHAL

• Supply, Installation of Exterior Lighting (LED Full lighting system )including Control and color Change Over System.
• Supply, Installation, T&C of SMDB’s and DB’s including necessary Conduits, trays, cabling, supports, connections, terminations and accessories.
• Supply, Installation, T&C of central battery system including controls, inverter, batteries, battery racks, battery charge and all other necessary accessories.
• Supply, Installation of for mechanical Washdown System for Al Wahda Arch
• Supply and Extract ductworks of Air conditioning & Ventilation

PROJECT 10
Design & Construction of Al Bustan Street North P007 C7 P2 IA 15/16/C 002 ST

Main Contractor : CCC-TEYSEER  Cont. Co. JV

Owner : ASHGHAL

• Installation of MV & LV Cables in different size (60000 Mtrs.)
• Jointing & Terminations of above-mentioned Cables
• Removal of Existing dead MV & LV Cables
• Installation, Testing & Commissioning of Substation equipment’s
• Removal of existing substation equipment and return to KM store & Construction of Distribution Substation
• Construction of Utility Building and Control room

PROJECT 11
Roads and Infrastructure in Al Kharaitiyat and Izghawa / Phase 1 – Package 3 (DN004-P03) (MV / LV & Street Lighting Works)

Main Contractor : ALGHANIM INTERNATIONAL-QATAR W.L.L

Owner : ASHGHAL

• Installation of Street Lighting Poles and Cables
• Supply and Installation of Street Lighting Feeder Pillars
• Supply and Installation of ground rods at each end of circuit locations & FP
• Installation of MV & LV Cables including Joints and Terminations.
• Supply and install of Electrical Service Cabinet

PROJECT 12
EPIC for New Port Control Tower - 576 Project - (Qatar Energy)

Main Contractor : MIDMAC CONTRACTING COMPANY

Owner : QATAR ENERGY

• 11 kV Switchgears
• 2000 KVA Transformers
• Installation of 5000 Mtr of 11 kV cable 3C x 240 mm2

PROJECT 13
11kv Substation Works - Doha Oasis Banyan Tree Hotel Extension

Main Contractor : IMAR Trading and Contracting Co. WLL

Owner : HALOUL

• Supply and Installation of 1100 Lm Busduct of 2500 Amp
• Supply and Installation LV Panels
• 11KV Cable Installation, joints & terminations etc.

To Know more......

Download our Company profile here,